The guys worked at a quick pace through the afternoon.
Solyvien was given the job of removing the frame from the outside shower. It needed to be revised to meet the slope of the school shelter extension.
Manu hammered out the nails from the old shower roof frame.
Their were a lot of eager young boys willing to lend a hand!
No comments:
Post a Comment