We went to the local hardware store and loaded Kimosabee with the supplies that we needed.
We never have a shortage of helping hands!
The construction work took place at the same time as school was in session. It worked out well.
Bill leveled the top of the wall in preparation for laying support blocks for the roof frame.
The blocks were anchored around the existing rebar. Bill layed them, Richard was the mortar bearer ....
No comments:
Post a Comment