We used some of the leftover sand/gravel to make a walkway from the toilets to the dormitory rooms.
It makes things a lot cleaner.
Michelle even got a chance to use her nursing skills! She changed a bandage for a lady who had an abscess under her arm that opened and was infected.
While preparing for the arrival of Hurricane Tomas we made a channel through rubble pile in front of our house to the drainage pipe under the wall.
We wanted to make sure the water could easily drain out of the yard in heavy rain storms. It wasn't a very pleasant job for the guys to do but it got done!
No comments:
Post a Comment